§ 15.7. REVIEW TIMES
Latest version.
Review Schedule in business days for review processes within the Land Development Code.
Review times for applications and processes Business days after application Title 25-1 General Requirements and Procedures Development Assessment review [25-1-62] 15 Title 25 Subdivisions Preliminary Plan review [25-4-56(C)] 20 Plat review [25-4-82(B)] 18 Notification of plat determination [25-4-82(C)] 20 Notification of plat determination update [25-4-82(E)] 10 Title 25 Site Plans Notification of site plan determination [25-5-114(A)(1)] 20 Notification of small project site plan determination [25-5-114(A)(2)] 7 Notification of site plan update determination [25-5-114(A)(3)] 10 Site Plan Review Report 25-5-143(A) 18 Site Plan Review Report Notification 25-5-143(B) 20 Site Plan Review of initial update to meet Commission-imposed conditions 25-5-148(B) 10 25-11-63 Building, Demo, and Relocation Permit Review periods Type of Permit 1) Commercial buildings, new construction 25 2) Commercial buildings, remodeling and finishouts 15 3) Residential, new construction 15 4) Residential, remodeling of a complying structure 5 5a) Residential, remodeling of a noncomplying structure 5 5b) Residential, additions to a noncomplying structure 15 6) Sign, other than a nonconforming off-premise sign 10 7) Replacement of nonconforming off-premise sign 10 8) Repair of nonconforming off-premise sign 10 9) Demolition 5 10) Relocation 5
Source: Rule No. R161-16.10 , 6-6-16; Rule No. R161-17.11 , 5-15-17.