Austin |
Building Criteria Manual |
Section 4. RESIDENTIAL CONSTRUCTION |
Appendix 4.5.0. VOLUME BUILDER PROGRAM |
§ 4.5.11. Inspections:
Latest version.
a)
Participation in this program does not change the inspection process.
b)
Once the permit is received, the permit and a stamped plot plan should be kept on the job site.
c)
Inspectors will not accept flipped or mirrored construction plans in the field.
Source: Rule No. R161-17.10 , 5-15-17.