§ 4.6.2.5.1. Framing Inspection Prerequisites:  


Latest version.
  • a)

    All trade work and Stage 1 Energy Code required sealing (Foam) must be completed prior to scheduling this inspection, and

    b)

    The electrical rough inspection must be approved or conducted with minimal violations prior to scheduling the Framing Inspection.