§ 4.6.2.5.4. Grouped Framing Inspection:


Latest version.
  • The framing inspection for new construction, unoccupied additions or unoccupied remodels where the scope of renovations exceeds 50% of the existing structure shall be scheduled and inspected as a grouped inspection with the plumbing and mechanical systems.

    Alteration (as defined in the IRC Appendix J) is the reconfiguration of any space; the addition or elimination of any door or window; the reconfiguration or extension of any system; or the installation of any additional equipment.