Austin |
Code of Ordinances |
Title 14. USE OF STREETS AND PUBLIC PROPERTY. |
Chapter 14-11. USE OF RIGHT-OF-WAY. |
Article 2. USE OF RIGHT-OF-WAY FOR CONSTRUCTION, EXCAVATION, FACILITY INSTALLATION, OR TEMPORARY USE. |
SubPart B. Excavation and Facility Installation Permits. |
§ 14-11-182. MAINTENANCE OF EXCAVATION REPAIRS.
(A)
A permit holder shall maintain repairs in the right-of-way. The director may require a permit holder to enter a maintenance agreement for a period not to exceed two years and provide a surety bond in the amount of $10,000 for maintenance of the repair.
(B)
A permit holder shall warrant, and by acceptance of a permit, does warrant for a period not to exceed two years, pavement repairs made by the permit holder until the City or another permit holder reconstructs the street or overlays the repair. An owner shall warrant backfill for the lifetime of the facility.
(1)
The director shall notify a permit holder of repairs required under this subsection.
(a)
A permit holder shall make the repairs within one week of notification.
(b)
If repairs are not made by the permit holder within one week of notification, the City may repair the street and the permit holder, by accepting the permit, agrees to pay the City's actual cost of making the repair.
(C)
An owner shall adjust and maintain adjustments of utilities in advance of City capital improvements for a period of six weeks following the adjustment or until the City begins construction of the improvement, whichever period is less.
Source: Ord. No. 20170817-045 , Pt. 2, 8-17-17.