§ 15-1-16. CROSS CONNECTION SURVEY.  


Latest version.
  • (A)

    The director may conduct a cross connection survey of the customer's potable water system as a condition of service to prevent or eliminate cross connections between the customer's potable water system and contamination or pollution sources.

    (B)

    The director shall inspect:

    (1)

    a building and surrounding property for potential cross connections;

    (2)

    the availability of an auxiliary or reclaimed water supply;

    (3)

    the use of a pollutant, contaminant and other liquid, solid, or gaseous substance;

    (4)

    backflow prevention assembly installation; and

    (5)

    backflow prevention certification and test records.

    (C)

    The director shall require a customer to eliminate possible cross connections between the customer's potable water systems and the public water supply as provided in Article 5 ( Enforcement ).

Source: Ord. 040108-3.