§ 15-10-54. PRETREATMENT PLANS.  


Latest version.
  • (A)

    A person required to pretreat waste or wastewater before discharge to the POTW, must submit complete plans and specifications for the pretreatment system to the director.

    (B)

    A plan developed under this section shall describe the proposed pretreatment method, process, or technology, including products, chemicals, agents or devices used for pretreatment.

    (C)

    A person must obtain the director's approval prior to:

    (1)

    discharging wastewater; or

    (2)

    constructing, using or modifying a pretreatment facility, method, process or technology.

Source: 1992 Code Section 18-2-54; Ord. 031204-14; Ord. 031211-11.