§ 15-10-59. TOXIC ORGANIC MANAGEMENT PLAN.  


Latest version.
  • (A)

    The director may require submission of a toxic organic management plan as an alternative to or in addition to routine total toxic organics monitoring for a user regulated under the CFR categories of:

    (1)

    electroplating;

    (2)

    metal finishing;

    (3)

    electrical and electronic components; or

    (4)

    other categories authorized by the CFR.

    (B)

    A toxic organic management plan submitted under this section must include:

    (1)

    a complete inventory of all toxic organic chemicals:

    (a)

    used in regulated process operations, including organic constituents of a trade-name product; or

    (b)

    identified through wastewater sampling and analysis;

    (2)

    a description of disposal methods, excluding dumping, used for inventoried compounds;

    (3)

    spill prevention, control, and countermeasures plan to prevent spillage or leakage of a regulated toxic organic chemical into process wastewater, floor drains, non-contact cooling water, groundwater, surface water or general discharge of a toxic organic chemical;

    (4)

    determination of identity and approximate quantity of toxic organic chemical used and discharged from a regulated manufacturing process; and

    (5)

    identity of toxic organic chemicals that may be present in wastewater discharged to the sanitary sewer as a result of a regulated process or disposal, spill, leak, rinse water carryover, air pollution control, and other source.

Source: 1992 Code Section 18-2-59; Ord. 031204-14; Ord. 031211-11.