§ 15-9-293. TIME PERIOD FOR BILLING ADJUSTMENTS.


Latest version.
  • (A)

    If the director is able to determine the date on which a customer's wastewater meter became inaccurate or unreliable, the director shall adjust the customer's wastewater billings back from that date.

    (B)

    If the director cannot determine the date on which a customer's wastewater meter became inaccurate or unreliable, the director shall adjust the customer's wastewater billings for one-half the period of time elapsed between the date the meter was last tested and the date the director determined that the meter was inaccurate or unreliable.

Source: 1992 Code Section 18-4-413; Ord. 031204-14; Ord. 031211-11.