§ 3.2.13. High-Rise Review  


Latest version.
  • High-rise construction documents will be reviewed in the same manner as other structures. The review will encompass all special features that are specifically required for all high-rise buildings. The reviews must be completed prior to construction or installation of features or systems, as applicable. For reviews to take place the following information shall be included:

    A.

    Complete set of prints/plans showing the following:

    1.

    Fire control room location and dimensions

    2.

    Location, type and maximum dimensions of all equipment contained within the fire control room (i.e., fire alarm/detection panels, public address and voice alarm system panels, fire department communication panels, elevator control panels, emergency generator control panel, HVAC control panel, etc.). For the submittal requirements on a particular system, see the appropriate section of "Specific Reviews."

    3.

    Outside telephone

    4.

    Cabinet for handsets to the fireman phones

    5.

    Secured building key box

    6.

    Confirmation of all required systems

    B.

    High-rise construction documents shall be designed in accordance with the latest locally adopted editions of the International Building Code, International Fire Code, Uniform Mechanical Code, Uniform Plumbing Code and any applicable amendments and rules.