§ 25-2-744. UNIVERSITY/DEEP EDDY SUBDISTRICT REGULATIONS.  


Latest version.
  • (A)

    This section applies in the University/Deep Eddy subdistrict of the WO combining district.

    (B)

    The primary setback lines are located:

    (1)

    200 feet landward from the Town Lake shoreline, between Tom Miller Dam and Red Bud Trail; and

    (2)

    300 feet landward from the Town Lake shoreline, between Red Bud Trail and MoPac Boulevard.

    (C)

    The secondary setback lines are located:

    (1)

    50 feet landward from the primary setback line, between Tom Miller Dam and Red Bud Trail; and

    (2)

    100 feet landward from the primary setback line, between Red Bud Trail and MoPac Boulevard.

    (D)

    For a primary setback area, a secondary setback area, or an area within 50 feet of a secondary setback line:

    (1)

    the maximum building height is 35 feet; and

    (2)

    the floor to area ratio may not be increased under Section 25-2-714 (Additional Floor Area).

    (E)

    For an area not included in a primary setback area or a secondary setback area, the maximum impervious cover is 40 percent.

    (F)

    The maximum height is the lower of 60 feet or the maximum height allowed in the base zoning district.

Source: Section 13-2-702(a); Ord. 990225-70; Ord. 031211-11; Ord. 20090611-074.