§ 25-8-233. BARTON SPRINGS ZONE OPERATING PERMIT.  


Latest version.
  • (A)

    In the Barton Springs Zone, the owner or operator of a commercial or multifamily development is required to obtain an annual operating permit for the required water quality controls.

    (B)

    To obtain an annual operating permit, an applicant must:

    (1)

    provide the Planning and Development Review Department with:

    (a)

    a maintenance plan; and

    (b)

    the information necessary to verify that the water quality controls are in proper operating condition; and

    (2)

    pay the required, nonrefundable fee.

    (C)

    The Planning and Development Review Department may verify that a water quality control is in proper operating condition by either inspecting the water quality control or accepting a report from a registered engineer.

    (D)

    The Planning and Development Review Department shall issue an operating permit after determining that:

    (1)

    the applicant has complied with the requirements of Subsection (B); and

    (2)

    the water quality controls are in proper operating condition.

    (E)

    The Planning and Development Review Department shall transfer an operating permit to a new owner or operator if, not later than 30 days after a change in ownership or operation, the new owner or operator:

    (1)

    signs the operating permit;

    (2)

    accepts responsibility for the water quality controls; and

    (3)

    documents the transfer on a form provided by the Planning and Development Review Department.

Source: Subsections 13-7-11(b), (c), and (d); Ord. 990225-70; Ord. 010329-18; Ord. 031211-11; Ord. 20131017-046.