§ 25-8-323. TEMPORARY STORAGE AREAS; TOPSOIL PROTECTION.


Latest version.
  • (A)

    The site plan or subdivision construction plan must designate the areas to be cleared for temporary storage of spoils or construction equipment. Areas cleared for temporary storage must be located and restored in accordance with the Environmental Criteria Manual.

    (B)

    During and after site grading operations, the topsoil must be protected and vegetation left in place to the maximum extent practicable.

Source: Section 13-7-15; Ord. 990225-70; Ord. 031211-11.