§ 30-5-301. CONSTRUCTION OF A ROADWAY OR DRIVEWAY.  


Latest version.
  • (A)

    A person may not construct a roadway or driveway on a slope with a gradient of more than 15 percent unless the construction is necessary to provide primary access to:

    (1)

    at least two contiguous acres with a gradient of 15 percent or less; or

    (2)

    building sites for at least five residential units.

    (B)

    For construction described in this section, a cut or fill must be revegetated, or if a cut or fill has a finished gradient of more than 33 percent, stabilized with a permanent structure. This does not apply to a stable cut.

Source: City Code Section 25-8-301; Ord. 031211-11; Ord. 031211-42.