The subdivision construction plan must designate the areas to be cleared for temporary
storage of spoils or construction equipment. Areas cleared for temporary storage must
be located and restored in accordance with the Environmental Criteria Manual.
(B)
During and after site grading operations, the topsoil must be protected and vegetation
left in place to the maximum extent practicable.
Source: City Code Section 25-8-323; Ord. 031211-11; Ord. 031211-42.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');