§ 30-5-341. CUT REQUIREMENTS.  


Latest version.
  • (A)

    Cuts on a tract of land may not exceed four feet of depth, except:

    (1)

    in an urban watershed;

    (2)

    in a roadway right-of-way;

    (3)

    for construction of a building foundation or swimming pool;

    (4)

    for construction of a water quality control or detention facility and appurtenances for conveyance such as swales, drainage ditches, and diversion berms, if:

    (a)

    the design and location of the facility within the site minimize the amount of cut over four feet;

    (b)

    the cut is the minimum necessary for the appropriate functioning of the facility; and

    (c)

    the cut is not located on a slope with a gradient of more than 15 percent or within 100 feet of a classified waterway;

    (5)

    for utility construction or a wastewater drain field, if the area is restored to natural grade;

    (6)

    in a state-permitted sanitary landfill or a sand or gravel excavation located in the extraterritorial jurisdiction, if:

    (a)

    the cut is not in a critical water quality zone;

    (b)

    the cut does not alter a 100-year floodplain;

    (c)

    the landfill or excavation has an erosion and restoration plan approved by the single office; and

    (d)

    all other applicable City Code and County Code provisions are met.

    (B)

    A cut must be restored and stabilized.

    (C)

    A roadway cut must be contained within the roadway clearing width described in Section 30-5-322 ( Clearing For A Roadway ).

Source: City Code Section 25-8-341; Ord. 031211-11; Ord. 031211-42; Ord. No. 20170615-102 , Pt. 47, 6-15-17.