§ 130S.5. Measurement
Latest version.
Borrow will be measured by the cubic yard (cubic meters: 1 cubic meter is equal to 1.196 cubic yards) in its final position based upon the average end areas, calculated from pre-construction cross sections and plan grades. The plan quantities for Borrow or Topsoil will be used as the measurement for payment for this item.