§ 1803S.10. Shop Drawings and Submittals  


Latest version.
  • All sample submittals, shop drawings, setting drawings, and schedules required for the work of the various trades by the Contract Documents will be submitted by the Contractor to the Consulting Engineer. The Consulting Engineer shall review, identify any required corrections, correct the Record Reproducible Drawings if required, and inform the Contractor of the status of the shop drawings. The Consulting Engineer shall then forward two copies of the corrected shop drawings and/or four copies of the corrected plans to the appropriate plan review department, which will forward the corrected drawings and plans to the Construction Inspection Division for continued inspection. Any work identified in a shop drawing or sample submittal shall not proceed until amended Drawings (plans) have been received by the Inspector.