§ 1804S.3. Materials and Quality of Work  


Latest version.
  • Unless otherwise specified, the materials and equipment furnished for permanent installation in the Work shall conform to all applicable requirements of the Contract Documents and shall be new, unused and undamaged when installed or otherwise incorporated in the Work. When an article of material or equipment is specified by definitive description, or identified only by using a proprietary name or name of a particular manufacturer or vendor, such description/name shall be accepted as establishing the type, function, class and quality of product specified. The Owner/Developer through the Contractor or the Consulting Engineer shall submit descriptive information and evidence to the Director or designated representative that the materials and equipment, proposed by the Contractor for incorporation in the Work, is of the kind, capacity and quality that satisfies the specified types, functions, classes and quality.

    The Water and Wastewater Utility Standard Products Lists (SPLs) form a part of the Contract Documents. When the Contractor elects to use any materials/products from the Standard Products Lists, the materials/products shall be clearly and completely identified when submitted for use in the Work. Any material/product, which is proposed for use in the Work, shall be submitted to the Consulting Engineer and the Inspector for review and approval prior to the use and/or incorporation of the material/product in the Work.

    The City of Austin Standard Specification Item 340S, "Hot Mix Asphaltic Concrete Pavement" and Specification Item 360, "Concrete Pavement," provide for the option of possible acceptance of pavements, which do not fully meet all specified requirements. If the reduced-standard pavements are otherwise acceptable in accordance with Standard Specifications 340S or 360 and to the Director or designated representative, then the Owner/Developer or the Contractor may, with the concurrence of the Director, request that the Work be made acceptable by providing a cash payment to the applicable street maintenance entity for deposit in the annual street maintenance fund. The dollar amount shall be calculated by reducing the base value of standard pavements by the percentages established by factors incorporated in Standard Specification items 340S for asphalt pavements and 360 for concrete pavements. The base values for standard pavements shall be determined by the Director from the average costs for concrete or asphalt pavement construction, respectively, in previous years under contract to the Department of Public Works. The amount of cash payment shall be the amount of the dollar reduction.