§ 1806S.6. Warranty Bond Release


Latest version.
  • After the Letter of Conditional or Final Acceptance of the completed Work, including street and drainage work, is issued, the completed Work will be monitored by the Inspector. If failures, defects and/or damage appear in the Work, the Owner/Developer or the Contractor will be notified of the need for corrective action as required in Sections 1804S.2 and 1806S.4. Upon completion of one year warranty period for defective work caused by the development of the property with no outstanding warranty claims, the Owner/Developer or the Contractor and their bonding company will be provided a Letter of Bond Release by the City of Austin.

    End

    RELATED CROSS REFERENCE MATERIALS
    Specification 1806S, "Final Acceptance"
    City of Austin Standard Contract Documents, General Conditions Section 00700
    Designation Description
    Article 1 Definitions
    Article 5 Bonds and Insurance
    Article 13 Tests and Inspections; Correction, Removal or Acceptance of Defective Work
    Article 16 Claims and Dispute Resolution
    The Code of the City of Austin
    Designation Description
    Article 25-1-288 Inspection of Erosion & Sedimentation Controls; Tree Protection measures
    Article 25-1-286 Inspection requests
    Article 25-1-287 Inspection Record Cards
    Article 25-1-289 Reinspection Fee
    Article 15-12-138 Restoration of Work Site
    Article 25-6-351 related to Sidewalk Locations/tree protection
    Chapter 25, Subchapter B Tree and Natural Area Protection
    City of Austin Environmental Criteria Manual
    Designation Description
    Section 3 Tree and Natural Area Preservation
    Appendix O Landscape/Irrigation Notes
    City of Austin Utility Criteria Manual
    Designation Description
    Section 5.4.0 Restoration Requirements
    Section 5.5.0 Pavement Repairs
    City of Austin Standard Specifications
    Designation Description
    Item No. 610S Preservation of Trees and Other Vegetation