Accepted work performed as prescribed by this item will be paid per each paver grate
and/or tree grate. Each grate installation shall include a grate frame as detailed
in Standards 437S-1, Sheet 1 and 437S-2, sheet 2.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');