SERIES 500 - PIPE AND APPURTENANCES  


ITEM NO. 501S - JACKING OR BORING PIPE 9-26-12
§ 501S.1. Description
§ 501S.2. Submittals
§ 501S.3. Materials
§ 501S.4. Construction Methods
§ 501S.5. Measurement
§ 501S.6. Payment
ITEM NO. 503S - FRAMES, GRATES, RINGS AND COVERS 2-17-00
§ 503S.1. Description
§ 503S.2. Submittals
§ 503S.3. Materials
§ 503S.4. Construction Methods
§ 503S.5. Measurement and Payment
ITEM NO. 504S - ADJUSTING STRUCTURES 2-24-10
§ 504S.1. Description
§ 504S.2. Submittals
§ 504S.3. Materials
§ 504S.4. Construction Methods
§ 504S.5. Measurement
§ 504S.6. Payment
ITEM NO. 505S - CONCRETE ENCASEMENT AND ENCASEMENT PIPE 2-24-10
§ 505S.1. Description
§ 505S.2. Submittals
§ 505S.3. Materials
§ 505S.4. Construction Methods
§ 505S.5. Measurement
§ 505S.6. Payment
ITEM NO. 506 - MANHOLES 3-15-11
§ 506.1. Description
§ 506.2. Qualifications
§ 506.3. Project Submittals
§ 506.4. Materials
§ 506.5. Construction
§ 506.6. Acceptance Testing of Wastewater Manholes
§ 506.7. Measurement
§ 506.8. Payment
ITEM NO. 507S - BULKHEADS 3-26-08
§ 507S.1. Description
§ 507S.2. Submittals
§ 507S.3. Material
§ 507S.4. Construction Methods
§ 507S.5. Measurement and Payment
ITEM NO. 508S - MISCELLANEOUS STRUCTURES AND APPURTENANCES 2-24-10
§ 508S.1. Description
§ 508S.2. Submittals
§ 508S.3. Types
§ 508S.4. Materials
§ 508S.5. Construction Methods
§ 508S.6. Measurement
§ 508S.7. Payment
ITEM NO. 509S - EXCAVATION SAFETY SYSTEMS 9-26-12
§ 509S.1. Description
§ 509S.2. Definitions
§ 509S.3. Excavation Safety System Plan Submittal
§ 509S.4. Excavation Safety System Plan Review
§ 509S.5. Excavation Safety System Submittal Review
§ 509S.6. Contractor's Responsibility
§ 509S.7. Construction Methods
§ 509S.8. Changed Conditions
§ 509S.9. Measurement
§ 509S.10. Payment
ITEM NO. 510 - PIPE 12-8-18
§ 510.1. Description
§ 510.2. Materials
§ 510.3. Construction Methods
§ 510.4. Measurement
§ 510.5. Payment
ITEM NO. 511S - WATER VALVES 9-26-12
§ 511S.1. Description
§ 511S.2. Materials
§ 511S.3. Valves
§ 511S.4. Construction Methods
§ 511S.5. Measurement
§ 511S.6. Payment
ITEM NO. 551 - PIPE UNDERDRAINS 5-16-97
§ 551.1. Description
§ 551.2. Materials
§ 551.3. Construction Methods
§ 551.4. Measurement
§ 551.5. Payment
ITEM NO. 558 - STRUCTURAL PLATE STRUCTURES 9-26-12
§ 558.1. Description
§ 558.2. Materials and Manufacture
§ 558.3. Visual Inspection
§ 558.4. Mill and Factory Inspection
§ 558.5. Quality of Work
§ 558.6. Design
§ 558.7. Designation of Type
§ 558.8. Construction Methods
§ 558.9. Measurement
§ 558.10. Payment
ITEM NO. 559S - PORTLAND CEMENET CONCRETE BOX CULVERTS 10-3-13
§ 559S.1. Description
§ 559S.2. Submittals
§ 559S.3. Quality Control
§ 559S.4. Materials
§ 559S.5. Fabrication
§ 559S.6. Testing
§ 559S.7. Fabricating Tolerances
§ 559S.8. Defects and Repair
§ 559S.9. Storage and Shipment
§ 559S.10. Construction Methods
§ 559S.11. Measurement
§ 559S.12. Payment
ITEM NO. 591S - RIPRAP FOR SLOPE PROTECTION 1-4-16
§ 591S.1. Description
§ 591S.2. Submittals
§ 591S.3. Materials
§ 591S.4. Construction Methods
§ 591S.5. Measurement
§ 591S.6. Payment
ITEM NO. 593S - P.C. CONCRETE RETARDS 2-24-10
§ 593S.1. Description
§ 593S.2. Submittals
§ 593S.3. Materials
§ 593S.4. Construction Methods
§ 593S.5. Measurement
§ 593S.6. Payment
ITEM NO. 594S - GABIONS AND REVET MATTRESSES 9-26-12
§ 594S.1. Description
§ 594S.2. Materials
§ 594S.3. Construction
§ 594S.4. Quality of Work
§ 594S.5. Measurement
§ 594S.6. Payment