§ 601S.1. Description  


Latest version.
  • This item shall govern the removal, storage and placement of approved on-site naturally occurring topsoil and topsoil mix (see 601S.3.A) to the depths and area shown on the Drawings or as directed by the Engineer or Landscape Architect.

    This specification is applicable for projects or work involving either inch-pound or SI units. Within the text and accompanying tables, the inch-pound units are given preference followed by SI units shown within parentheses.

Source: Rule No. R161-16.21, 11-14-16 .