§ 608S.7. Acceptability of Plants  


Latest version.
  • Between 90 to 100 days following the initial planting and initial plant replacement, the Engineer or designated representative will make an inspection of the project to determine the acceptability of the plant material. At this time, an inventory of missing, dead or rejected plant material will be made and the Contractor notified that the plants on the inventory are to be replanted the following planting season between November 15 and December 15 or as specifically permitted by the Engineer or designated representative.

    Plant material for the replacement planting shall meet all the requirements specified for the original plant material and shall be planted in accordance with the planting instructions listed under "Construction Methods", except that no further plant replacement will be required. Working days stated in the Contract shall apply to the initial construction period only and will not include the time necessary for replanting. A final inspection shall be made within 10 days after the replacement planting is completed.