§ 621S.6. Payment


Latest version.
  • The work performed and materials furnished and measured as provided under "Measurement" will be paid for at the unit bid price per lineal foot for Diversion as indicated on the Drawings. The unit bid price shall include: a) full compensation for furnishing, hauling and placing all materials; b) all labor, tools, seeding, equipment and incidentals needed to complete the work, c) any repair, replacement and seeding of materials to maintain the Diversion d) removal and disposal of all materials at the completion of construction and e) reseeding the areas disturbed by the removal of the temporary Diversion.

    Payment will be made under:

    Pay Item No. 621S: Diversion Per Lineal Foot.

     

    End

    SPECIFIC CROSS REFERENCE MATERIALS
    Specification Item 621S "Diversion (Temporary)"
    City of Austin Standard Specifications
    Designation Description
    Item No. 130S Borrow
    Item No. 604S Seeding for Erosion Control
    Item No. 606S Fertilizer
    City of Austin Standard Details
    Designation Description
    No. 621S-1 Diversion
    Texas Department of Transportation: Manual of Testing Procedures
    Designation Description
    Tex-103-E Determination of Moisture Content of Soil Materials
    Tex-104-E Determination of Liquid Limit of Soils
    Tex-105-E Determination of Plastic Limit of Soils
    Tex-106-E Method of Calculating the Plasticity Index of Soils
    Tex-114-E Laboratory Compaction Characteristics and Moisture-Density Relationship of Subgrade & Embankment Soil
    Tex-115-E Field Method for Determination of In-Place Density of Soils and Base Materials

     

    RELATED CROSS REFERENCE MATERIALS
    Specification Item 621S "Diversion (Temporary)"
    City of Austin Land Development Code
    Designation Description
    Chapter 25 Drainage
    Section 25-7-61 Criteria for Approval of Plats, Construction Plans, And Site Plans
    Section 25-7-61 (A) (4) "temporary and permanent measures to control erosion…"
    Section 25-7-65 Fiscal Security
    Article 5 Erosion and Sedimentation Control; Overland Flow
    Section 25-8-181 Erosion and Sedimentation Control
    Section 25-8-182 Development Completion
    Section 25-8-183 Modification of Erosion Control and Construction Sequencing Plans
    Section 25-8-323 Temporary Storage Areas; Topsoil Protection
    Section 25-8-341 (B) "A cut must be restored and stabilized"
    Section 25-8-342 (B) "A fill must be restored and stabilized"
    City of Austin Environmental Criteria Manual
    Designation Description
    Section 1.4.0 Erosion and Sedimentation Control Criteria
    Section 1.4.1 Introduction
    Section 1.4.1.2 Project Management
    Section 1.4.2 Temporary Structural Practices
    Section 1.4.2.B Diversion, Interceptor and Perimeter Dikes
    City of Austin Standard Specifications
    Designation Description
    Item No. 101S Preparing Right of Way
    Item No. 102S Clearing and Grubbing
    Item No. 111S Excavation
    Item No. 132S Embankment
    Item No. 201S Subgrade Preparation
    Item No. 601S Salvaging and Placing Topsoil
    Item No. 605S Soil Retention Blanket
    Item No. 607S Slope Stabilization
    City of Austin Standards (Details)
    Standard No. Description
    No. 627S-1 Grass Lined Swale
    No. 627S-2 Grass Lined Swale W/ Stone Center
    No. 633S-1 Landgrading
    Texas Department of Transportation: Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges
    Designation Description
    Item No. 100 Preparing Right of Way
    Item No. 110 Excavation
    Item No. 160 Furnishing and Placing Topsoil
    Item No. 164 Seeding for Erosion Control
    Item No. 166 Fertilizer
    Item No. 168 Vegetative Watering
    Item No. 169 Soil Retention Blanket