§ 640S.6. Payment


Latest version.
  • Mortared rock wall acceptably completed will be paid for at the contract unit bid price per square foot. The unit bid price shall include full compensation for furnishing all materials, for excavation, and backfill, for all forming, transporting, placing, finishing and for all equipment, tools, labor and incidentals necessary to place mortared rock wall on concrete footing as specified and indicated on the Drawings.

    Payment will be made under:

    Pay Item No. 640S: Mortared Rock Wall Per Square Foot.

     

    End

    SPECIFIC CROSS REFERENCE MATERIALS
    Specification 640S, "Mortared Rock Wall"
    American Society for Testing and Materials, ASTM
    Designation Description
    C 91 Specification for Masonry Cement
    C 144 Specification for Aggregate for Masonry
    C 150 Specification for Portland Cement
    C 207 Specification for Hydrated Lime for Masonry

     

    RELATED CROSS REFERENCE MATERIALS
    Specification 640S, "Mortared Rock Wall"
    City of Austin Standard Specifications
    Designation Description
    Item No. 101S Preparing Right-of-Way
    Item No. 102S Clearing and Grubbing
    Item No. 111S Excavation
    Item No. 401 Structural Excavation and Backfill
    Item No. 403S Concrete for Structures
    Item No. 405 Concrete Admixtures
    Item No. 406 Reinforcing Steel
    Item No. 606S Fertilizer
    Item No. 608S Planting
    Item No. 610S Preservation of Trees and Other Vegetation
    Item No. 620S Filter Fabric
    Texas Department of Transportation: Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges
    Designation Description
    Item No. 100 Preparing Right-of-Way
    Item No. 110 Excavation
    Item No. 132 Embankment
    Item No. 158 Specialized Excavation Work