Appendix C. COMPUTERIZED PAVEMENT DESIGN PROGRAM MUNICIPAL RIGID PAVEMENT DESIGN (MRPS-1) INPUT GUIDE
This appendix provides the necessary information for preparing an input data set for a Municipal Rigid Pavement Design (MRPS-1) pavement design solution. It illustrates the overall input data structure for a single solution. There are 11 cards or card images, each beginning with a four (4) letter descriptor which identifies the type of information contained on each card. Inspection of the figure shows that each variable in the input structure has an assigned name or acronym that corresponds to the variable descriptions presented later.
It is important to recognize that any variable appearing between columns 5 and 10 (with the exception of the first card image) is an "integer" variable and must therefore be entered right-justified in its field and must not have a decimal point. With the exception of the first card images, all variables between columns 11 and 70 are "real" variables and should (for checking purposes) be right-justified and input with a decimal point. Three (3) variables "NPROB" and "TITLE" on card image 1 and "NAME" on card image 4 are known as alphanumeric variables and may consist of any combination of letters, numbers or other display characters between columns 11 and 80.
Other important notes relative to the subsequent input variable descriptions are as follows:
1.
Abbreviations for symbols used:
col. - column numbers LF - linear foot SY - square yard CY - cubic yard psi - pounds per square inch pci - pounds per cubic inch mph - miles per hour $ - U. S. dollars 2.
A [default] is the value of the variable that will be assigned by the program if left undefined (blank or equal to zero (0)) by the user.
To demonstrate the Municipal Rigid Pavement Design - 1 program, example input data and the corresponding Municipal Rigid Pavement Design - 1 output are included at the end of this appendix.
Municipal Rigid Pavement Design - 1 Input Variable Descriptions Card Image 1: Problem (PROB) Card Image NPROB = Problem number, alphanumeric, col. 5-10. TITLE = Problem description, alphanumeric, col. 11-80. Card Image 2: New Pavement (PAVT) Card Image NLT = Total number of lanes in the facility (both directions), integer, col. 5-6. NCURB = Total number of concrete curbs in the facility (0, 2 or 4), integer, col. 8. NSB = Number of subbase types (0 minimum, 4 maximum), integer, col. 10. PROLEN = Project length (miles), real, col. 11-15. WL = Lane width (feet), real, col. 16-29. [Default = 12.0.] HCURB = Curb height (inches), real, col. 21-25. [Default = 6.0.] CURBCC = Concrete curb construction cost ($/LF), real, col. 26-30. Card Image 3: Concrete Slab (SLAB) Card Image TCMIN = Minimum slab thickness (inches), real, col. 11-15. [Default = 6.0.] TCMAX = Maximum slab thickness (inches), real, col. 16-20. [Default = 10.0.] CINC = Slab thickness increment (inches), real, col. 21-25. [Default = 1.0.] CPCYC = Concrete placement cost ($/CY), real, col. 26-30. APCCSY = Additional concrete placement cost ($/SY), real, col. 31-35. PSVC = Concrete salvage value (percent), real, col. 36-40. SX = Seven-day concrete flexural strength (psi), real, col. 41-45. [Default = 500.] TS = Concrete tensile strength (psi), real, col. 46-50. [Default = 335.] E = Concrete elastic modulus (psi), real, col. 51-60. [Default = 4000000.] Card Image 4: Subbase (SUBB) Card Image ISB = Subbase number, integer, col. 6. TSMIN = Minimum subbase thickness (inches), real, col. 11-15. TSMAX = Maximum subbase thickness (inches), real, col. 16-20. SINC = Subbase thickness increment (inches), real, col. 21-25. CPCYS = Subbase cost ($/CY), real, col. 26-30. ASBCSY = Additional subbase cost ($/SY), real, col. 31-35. PSVS = Subbase salvage value (percent), real, col. 36-40. EF = Subbase erodability factor, real, col. 41-45. FFSB = Friction factor between subbase and Portland cement concrete slab, real, col. 46-50. ES = Subbase elastic modulus (psi), real, col. 51-60. NAME = Subbase description, alphanumeric, col. 71-80. Card Image 5: Subgrade (SUBG) Card Image PSS = Swelling probability, real, col. 11-15. THETA = Swelling rate constant, real, col. 16-20. SACT = Potential vertical rise (inches), real, col. 21-25. SGEXC = Subgrade excavation cost ($/CY), real, col. 26-30. ASGCSY = Additional subgrade cost ($/SY), real, col. 31-35. EFSG = Subgrade erodability factor, real, col. 41-45. FFSG = Friction factor between slab and subgrade, real, col. 46-50. SGK = Subgrade k-value (pci), real, col. 51-60. Card Image 6: Asphalt Concrete Overlay ACOV) Card Image OMINA = Minimum AC overlay thickness (inches), real, col. 11-15. [Default = 1.5.] OMAXA = Maximum total AC overlay thickness (inches), real, col. 16-20. [Default = 3.0.] THLEV = Average AC overlay level-up thickness (inches), real, 21-25. [Default = 0.5.] CPCYAC = AC overlay construction cost ($/CY), real, col. 26-30. CPSYR = Additional overlay cost ($/SY), real, col. 31-35. PSVAC = AC overlay salvage value (percent), real, col. 36-40. TAPOEC = Tapering cost for first overlay ($/LF), real, col. 41-45. SMILLC = Edge milling cost ($/LF), real, col. 46-50. ACE = AC overlay elastic modulus (psi), real, col. 51-60. [Default = 400000.] ACPR = AC production rate (CY/hour), real, col. 61-70. [Default = 40.] Card Image 7: Design Constraints (DCON) Card Image LEVCON = Confidence level index, integer, col. 6. = 1, Confidence level - 99.9 percent. = 2, Confidence level = 99 percent. = 3, Confidence level = 98 percent. = 4, Confidence level = 95 percent. = 5, Confidence level = 90 percent. [Default.] = 6, Confidence level = 85 percent. = 7, Confidence level = 80 percent. = 8, Confidence level = 75 percent. = 9, Confidence level = 50 percent. AP = Analysis period (years), real, col. 11-15. [Default = 20.] OFMIN = Minimum time to first overlay (years), real, col. 16-20. Recommended value is 10 years. [Default = 10.] BOMIN = Minimum time between overlays (years), real, col. 21-25. [Default = 5.] TMAX = Maximum thickness of slab and subbase (inches), real, col. 26-30. [Default = 30.] CMAX = Maximum fund available for initial construction ($/SY), real, col. 31-35. [Default = 50.] RINT = Discount rate (percent), real, col. 36-40. [Default = 5.] Card Image 8: Performance (PERF) Card Image P1 = Serviceability index after initial construction, real, col. 11-15.[Default = 4.0.] P2 = Terminal serviceability index, real, col. 16-20. [Default = 2.5.] POV = Serviceability index after AC overlay, real, col. 21-25. [Default = 4.0.] Card Image 9: Maintenance (MANT) Card Image CLW = Composite labor wage ($/hour), real, col. 11-15. CERR = Composite equipment rental rate ($/hour), real, col. 16-20. CMAT = Cost of materials ($/unit operations), real, col. 21-25. Card Image 10: Traffic (TRAF) Card Image ADTGR = Average daily traffic growth rate (percent/year), real, col. 11-15. DDF = Directional distribution factor (percent), real, col. [Default = 50.] DFL = Lane distribution factor (percent), real, col. 21-25. [Default = 90.] PCTRUK = Percent trucks in initial average daily traffic, real, col. 26-30. EF18K = 18-kip flexible pavement equivalency factor for average city truck, col. 31-35. ADTO = Initial average daily traffic (vehicles per day), real, col. 51-60. Card Image 11: Traffic Delay (TRFD) Card Image MODEL = Detour model number, integer, col. 6. [Default = 3.] NOLO = Number of open lanes through restricted zone in overlay direction, integer, col. 8. [Default = 1.] NOLN = Number of open lanes through restricted zone in nonoverlay direction, integer, col. 10. [Default = 2.] AAS = Average approach speed to overlay zone (mph), real, col. 11-15. [Default = 40.] ASOD = Average speed through restricted zone in overlay direction (mph), col. 16-20. [Default = 15.] ASND = Average speed through restricted zone in nonoverlay direction (mph), col. 21-25. [Default = 40.] DTSO = Distance traffic is slowed in overlay direction (miles), real, col. 26-30. [Default = 1.0.] DTSN = Distance traffic is slowed in nonoverlay direction (miles), real, col. 31-35. [Default = 0.0.] DDOZ = Detour distance around overlay zone for detour model 5 (miles), real, col. 36-40. [Default = 1.0.] HPDC = Number of hours per day overlay construction occurs, real, col. 41-45. [Default = 7.] TBEG = Beginning time of overlay construction (hundred hours), real, col. 51-60. [Default = 0800.] TEND = Ending time of overlay construction (hundred hours), real, col. 61-70. [Default = 1600.] Figure B-1 Input Data Structure for MRPS-1
MRPS-1 Code Sheet
MRPS-1 Input Data Structure
MRPS-1 Input Data Structure (continued)
MRPS-1 Output, Page 1
MRPS-1 Output, Page 2
MRPS-1 Output, Page 3