§ 12.4.2. Traffic Pole Load Analysis  


Latest version.
  • A.

    Each application for collocation of a network node on a service pole shall include a load analysis prepared by a Texas Registered Professional Engineer and must conform to the Transportation Department's approved process and methodology.

    B.

    The load analysis shall take into account and allow space for all attachments which are currently constructed or planned for future construction.

    C.

    The following information is required to be submitted:

    1.

    Specific location with X, Y coordinates and Traffic Signal Pole ID;

    2.

    Picture of entire Traffic Signal Pole;

    3.

    Traffic Signal Pole brand information (height and class);

    4.

    Height of each existing attachment present on the traffic pole and proposed height of wireless attachment;

    5.

    Identification of each attachment present on the traffic pole;

    6.

    Detailed drawings of the proposed wireless attachments and physical specifications (weight and dimensions);

    7.

    Electric Service Planning Application in accordance with the Austin Energy Design Criteria Manual;

    8.

    Type, height, and size of all attachments present on the traffic pole; and

    9.

    Ownership information on all attachments.