Utilities Criteria Manual Book View


UTILITIES CRITERIA MANUAL
SUPPLEMENT HISTORY TABLE
Section 1. AUSTIN ENERGY DESIGN CRITERIA
Section 2. WATER, RECLAIMED WATER, AND WASTEWATER CRITERIA
Section 3. COORDINATION OF UTILITIES
Section 4. UTILITY ASSIGNMENT IN RIGHT OF WAY
Section 5. WORKING IN PUBLIC RIGHTS-OF-WAY
Section 6. AUSTIN ENERGY POLE ATTACHMENTS
Appendix A. MISCELLANEOUS FORMS FOR WATER AND WASTEWATER
Appendix B. PERMANENT PAVEMENT REPAIR FEES
Appendix C. FIGURES AND MISCELLANEOUS
Figure 1-10. - Current Transformer Enclosure
Figure 1-11A. - S-1 Socket Enclosure (Typical Installation)
Figure 1-12. - One-Point Rack
Figure 1-13. - Portable Meter Loop for Temporary Overhead Construction Service (Typical Installation)
Figure 1-14. - Portable Meter Loop for Temporary Underground Construction Service (Typical Installation)
Figure 1-15A. - Meter Loop for Permanent Overhead Service Installation (Residential-Typical Installation)
Figure 1-15B. - Meter Loop for Permanent Overhead Service Installation (Residential-Typical Installation)
Figure 1-16A. - Meter Loop for Permanent Underground Service Installation (Residential/Commercial - Typical Installation)
Figure 1-16B. - Meter Loop for Permanent Underground Service Installation (Residential/Commercial - Typical Installation)
Figure 1-17. - Under Eaves Service Installation (Residential - Typical Overhead Installation)
Figure 1-18. - Through Roof Service Mast Installation (Residential - Typical Overhead Installation)
Figure 1-19. - Underground Service Installation (Residential - Typical Installation)
Figure 1-20. - Meter Loop for Permanent Overhead Service Installation (Commercial - Typical Installation)
Figure 1-21. - Under Eaves Service Installation (Commercial - Typical Installation)
Figure 1-22. - Through Roof Service Mast Installation (Commercial - Typical Installation)
Figure 1-23. - Underground Service Installation (Commercial - Typical Installation)
Figure 1-24. - Two Meter Permanent Overhead Installation (Typical Installation)
Figure 1-25. - Two Meter Permanent Underground Installation (Typical Installation)
Figure 1-26. - 3 to 12 Meters for Permanent Overhead or Underground Installation (Typical Installation)
Figure 1-27. - 13 to 18 Meters for Permanent Overhead or Underground Installation (Typical Installation)
Figure 1-34. - Overhead Clearance from Swimming Pools
Figure 1-35. - Underground Clearance from Swimming Pools
Figure 1-36. - OSHA/Texas Safety Code Overhead Working Clearances
Figure 1-37A. - Residential Underground Service Lateral Responsibilities
Figure 1-37B. - Residential Underground Service Lateral Responsibilities
Figure 1-38A. - Commercial Underground Service Lateral Responsibilities
Figure 1-38B. - Commercial Underground Service Lateral Responsibilities
Figure 5-1. - Proposed East-West Downtown 4th Street Rail Corridor
Figure 5-2. - Rail Corridor Clear Zone
Appendix D. DIAGRAMS FOR POLE ATTACHMENTS
Diagram 1 - Pole Clearances
Diagram 2 - Sag Clearances
Diagram 3 - Anchoring and Guying
Diagram 4 - Bonding and Grounding
Diagram 5 - Service Drop Attachment Point
Diagram 6 - Attachment Cable Risers
Diagram 7 - Wireless Antenna Tangent Pole Attachment
Diagram 8 - Wireless Attachments Communication Space
Diagram 9 - Wireless Antenna Installed on a Street Light Pole
Diagram 10 - Disconnect Switch and Lock
Appendix E. STANDARD POLE LICENSE AGREEMENT
GLOSSARY
BIBLIOGRAPHY
DISPOSITION TABLE - RULES