Appendix B. PERMANENT PAVEMENT REPAIR FEES  


Latest version.
  • Note that these fees are adopted annually by City Council Ordinance while adopting the budget of the City of Austin. A copy of the current fees in effect may be obtained from the Cut Permit Clerk.

    PERMANENT PAVEMENT AND PAVEMENT REPAIRS FEES, FY 1991-1992

    A. Asphalt Pavement $250 per cut minimum
    10 SY or less $250 per cut plus $8.50/SY for each additional square yard over 10 square yards.
    B. Concrete Pavement
    10 SY or less $250 per cut minimum
    Over 10 SY $250 per cut plus $20/SY for each additional square yard over 10 square yards.
    C. Asphalt Surface Over Concrete
    10 SY or less $300 per cut minimum
    Over 10 SY $300 per cut plus $25/SY for additional square yards over 10 square yards
    D. Sawing Asphalt
    40 LF or less $25 minimum
    Over 40 LF $25 plus $.25 for each additional linear foot over 40 linear feet
    E. Sawing Concrete
    40 LF or less $50 minimum
    Over LF less $50 plus $.50 for each additional linear foot over 40 linear feet
    F. Temporary Repairs
    10 SY or less $150 per cut plus $5/SY for each additional square yard over 10 square yards.
    G. Miscellaneous Items
    Minimum of $200 per item per location for:
     Concrete Curb and Gutter/2 l.f. or less $7.50 per linear foot over minimum
     Concrete Driveways/25 s.f. or less $7.50 per square foot over minimum
     Concrete Sidewalks and Ramps/25 $7.50 per square foot s.f. or less over minimum

     

    RIGHT-OF-WAY OCCUPANCY AND/OR CLOSURE FEES, FY 1991-1992

    A.

    Temporary use of public right-of-way authorized by Public Works for construction or utility maintenance by private Contractor:

    1.

    For City Work No fee is required

    2.

    For Parking Lanes $4/day

    3.

    For First Traffic Lane $5/day

    4.

    For Each Additional Traffic $3/day

    B.

    Temporary Use of Sidewalk and Alley Space:

    1.

    For City Work No fee required

    2.

    Any Location $3/day/maximum