§ 4.5.3. Submittal Requirements:  


Latest version.
  • a)

    Must sign the Home Builder Certification Affidavit for each subdivision or site plan the builder wishes to include in the program. This form must be notarized.

    b)

    Must submit a scaled full copy of the final approved and recorded subdivision plat or site plan, including plat notes, along with all applicable current required application submittal documents including, not limited to, floor plans, floor plan options including flipped or mirrored plans, framing plans, wall bracing plans, exterior options, and elevations. Foundation plans are not required for Master Set submittals but will be required for each individual permit application. Submissions shall be in paper and electronic format as required by the Program Coordinator, or their designee.

    Residential Submittal Requirements:

    https://www.municode.com/library/tx/austin/codes/building_criteria_manual?nodeId=S4RECO_4.4.0RESURE

    c)

    For concurrent site plan or subdivision review, a scaled copy of the recorded subdivision plat and all plat notes must be submitted for final coordination review and approved prior to the first permit application submittal.

    d)

    Builder must schedule a meeting with the Program Coordinator, or their designee, to discuss the proposed development and applicable impacts from zoning and building code requirements.

    e)

    Additional information as requested by the Program Coordinator, or their designee. This could include copies of relevant ordinances, deed restrictions, and other materials as applicable.

Source: Rule No. R161-17.10 , 5-15-17.