§ 4.6.2.9. Final Building Inspection  


Latest version.
  • a)

    Grouped Final Building Inspection: The Final Building Inspection for new construction, large additions or remodels where the scope of the renovation exceeds 50% of the existing structure shall be scheduled and inspected as a grouped inspection. This includes all required trade inspections, including energy, mechanical and plumbing.

    b)

    Required documentation at the Building Final Inspection for new construction:

    1.

    Foundation Letter: See Section 4.6.2 Foundation Inspection;

    2.

    Subterranean Termite Protection Letter: See Section 4.6.2 Subterranean Termite Protection;

    3.

    Wallboard Letter: See 4.6.2 Wallboard Inspection;

    4.

    Energy Reports: See 4.6.2 Energy Finals;

    5.

    Impervious Coverage Survey (If Applicable): If the impervious coverage for any residential project is within 5% of the maximum amount allowed, then an impervious cover survey is required.