§ 4.6.3.1. Plumbing Rough Inspection  


Latest version.
  • A plumbing rough inspection is required for all plumbing permits when work is done to drain, waste and vent lines (DWV) below the first floor level. All DWV lines must be plainly visible and accessible for inspection.

    a)

    For tunnel jobs under foundations or jobs where access cannot be reasonably provided for Building Inspection staff, then Building Inspection staff may accept photos in lieu of a visual inspection;

    b)

    The Builder (permittee) may proceed with work up to the Plumbing Rough state, at his own risk, while submitted plans are pending permit issuance.