§ 4.6.3.2. Copper Inspection (Plumbing Pre-pour)  


Latest version.
  • A copper inspection is required prior to the placement of concrete for any new monolithic or addition foundations. All re-bar or post tension cables shall be complete. All trenches and excavations shall be complete and pads must be covered with approved material.

    a)

    For all copper inspections, all water distribution lines and all drain, waste and vent lines in the foundation shall be tested in accordance with the currently adopted Plumbing Code.