§ 4.6.5.4. Routing of Inspections  


Latest version.
  • 1.

    The responsible contractor will coordinate with the homeowner for inspection access.

    2.

    The Inspector will leave the inspection site 15 minutes after the scheduled time for the inspection, if the responsible contractor is unable to provide access for the inspection.