Austin |
Building Criteria Manual |
Section 5. COMMERCIAL CONSTRUCTION - MECHANICAL, ELECTRICAL, PLUMBING AND OTHER TECHNICAL CODES |
Appendix 5.2.0. ELECTRICAL CODE |
§ 5.2.3. SIGN INSPECTION PROCESS - ELECTRICAL SIGNS
Latest version.
This rule is promulgated to administer and implement the provisions of the Sign Ordinance and the Electrical Code. No sign permit for an electrical sign shall receive a final inspection if the electrical permit has not passed final inspection. No sign may be served with electrical power until all required inspections have passed in accordance with the adopted Electrical Code.