A network node, node support pole, or transport facility is abandoned if: it ceases
providing or supporting the provision of wireless services for a period of 60 continuous
days or, if the permit for a network node, node support pole, or transport facility
expires or is terminated.
(B)
If on the 30
th
day after a network node, node support pole, or transport facility is abandoned, the
responsible network provider or its contractor has not removed the facility from the
public right-of-way, the director may remove the facility at the network provider's
cost and, at the director's option, invoice the network provider for the removal and
storage costs or draw on the fiscal security required by Section 14-11-103 (
Fiscal Security
) and invoice the network provider for any difference. The right of the director to
remove facilities is in addition to the right set out in Section 14-11-181 (
Relocation of Facilities
).
Source: Ord. No.
20170817-045
, Pt. 2, 8-17-17.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');