§ 15-10-55. INSPECTION AND APPROVAL.  


Latest version.
  • (A)

    A person may not discharge wastewater to the POTW from or through a pretreatment facility until the facility's design, size, construction plan, installation, and connection to the POTW has been inspected and approved by the director.

    (B)

    The director may require a pretreatment facility, process, device, agent or product to be tested prior to use or commencement of a discharge to the POTW.

Source: 1992 Code Section 18-2-55; Ord. 031204-14; Ord. 031211-11.