Austin |
Land Development Code |
Title 30. AUSTIN/TRAVIS COUNTY SUBDIVISION REGULATIONS. |
Chapter 30-1. GENERAL PROVISIONS AND PROCEDURES. |
Article 10. SUBDIVISION CONSTRUCTION. |
Division 3. Inspections; Completion of Work. |
§ 30-1-355. REINSPECTION FEE.
(A)
Except as provided in Subsection (B), the single office may charge a reinspection fee if at the time that an inspector attempts to conduct an inspection, the permittee:
(1)
has not finished the work to be inspected;
(2)
has not finished corrections previously required by an inspector;
(3)
has not posted the record inspection card;
(4)
does not make approved plans readily available to the inspector; or
(5)
does not provide access to the work on the scheduled inspection date.
(B)
Work that was rejected at the first inspection for failure to comply with a technical code may be reinspected without payment of a reinspection fee.
(C)
If a reinspection fee is due, additional inspections may not be performed until the reinspection fee is paid.
Source: City Code Section 25-1-289; Ord. 031211-11; Ord. 031211-42.