§ 30-5-366. RELOCATION OF SHORELINE BETWEEN TOM MILLER DAM AND LONGHORN DAM.


Latest version.
  • (A)

    This section applies:

    (1)

    along the Colorado River;

    (2)

    between Tom Miller Dam and Longhorn Dam; and

    (3)

    below a contour elevation of 435 feet above mean sea level.

    (B)

    City council approval is required to relocate existing earth material in the area described in Subsection (A).

    (C)

    A person may request approval under this section by filing an application with the council that includes a plan showing the proposed layout of the relocation and a legal description of the property.

    (D)

    The applicant must demonstrate to the council that:

    (1)

    approving the application will not:

    (a)

    endanger a water supply, water supply system, storm or sanitary sewer facility, or other public utility facility;

    (b)

    create a hazard to navigation or swimming;

    (c)

    create a hazard to the safety, maintenance and operation of a dam, bridge, or other structure not owned by the applicant; and

    (d)

    materially and adversely affect the use and enjoyment of other property on the Colorado River between the Tom Miller Dam and Longhorn Dam; and

    (2)

    if similar applications were granted for all similarly situated properties, the water storage or flood capacity of the Colorado River basin would not be materially reduced.

Source: City Code Section 25-8-651; Ord. 031211-11; Ord. 031211-42; Ord. No. 20160922-048 , Pt. 9.