Austin |
Transportation Criteria Manual |
Section 12. RULES AND DESIGN MANUAL FOR SMALL CELL NETWORK FACILITIES IN THE RIGHT-OF-WAY |
Appendix 12.2. General Provisions: Network Nodes, Node Support Poles, and Transport Facilities Within Public Right-of-Way |
§ 12.2.12. Removal Required by City
A.
A network provider must, at its cost, promptly disconnect, remove, or relocate a network node if the director determines that the disconnection, removal, or relocation (a) is necessary to protect the public health, safety, or welfare, or City property, (b) the network node is adversely affecting City operation or operations of City property, or (c) a network provider fails to obtain permits and certifications required by law. If there is imminent danger to the public, then the City may immediately disconnect, remove, or relocate the applicable network node at the network provider's expense.
B.
A network provider shall reimburse City for the City's actual cost of removal of its network node within 45 days of receiving the invoice from the City.