Appendix 6.1. PURPOSE, SAFETY, DEFINITIONS |
§ 6.1.1. PURPOSE |
§ 6.1.2. SAFETY |
§ 6.1.3. DEFINITIONS |
Appendix 6.2. GENERAL ADMINISTRATIVE PROVISIONS |
§ 6.2.1. Fees and Charges |
§ 6.2.2. License Agreement |
Appendix 6.2.3. Attachment Licenses |
§ 6.2.3.1. Attachment License Required |
§ 6.2.3.2. Overlashing |
§ 6.2.3.3. Application Process |
§ 6.2.3.4. Order of Consideration |
§ 6.2.3.5. Application Process for Network Nodes on Street Lights |
§ 6.2.3.6. Engineering/Pole Loading Analyses |
§ 6.2.3.7. Application Approval |
§ 6.2.3.8. Conditional Approval |
Appendix 6.3. GENERAL REQUIREMENTS |
§ 6.3.1. Compliance with Design Requirements |
§ 6.3.2. AE Oversight |
§ 6.3.3. Standards Conflicts |
§ 6.3.4. Cabinets, Power Supplies and Other Equipment |
§ 6.3.5. Tagging |
§ 6.3.6. Maintenance |
§ 6.3.7. Tree Trimming |
§ 6.3.8. No Damage |
Appendix 6.4. MAKE-READY CONSTRUCTION |
§ 6.4.1. Performance of Make-Ready Work |
§ 6.4.2. Existing Attachments |
§ 6.4.3. Construction |
§ 6.4.4. Coordination of Make-Ready Efforts |
§ 6.4.5. Authority to Proceed |
§ 6.4.6. Service Interruptions |
§ 6.4.7. Contractors |
§ 6.4.8. Materials |
§ 6.4.9. AE Property |
Appendix 6.5. MODIFICATION OF ATTACHMENTS |
§ 6.5.1. Unauthorized Modifications |
§ 6.5.2. Routine Modifications |
§ 6.5.3. AE Mandated Modifications |
§ 6.5.4. Emergencies |
§ 6.5.5. Destroyed Poles |
§ 6.5.6. Pole Transfers |
§ 6.5.7. Underground Conversion |
Appendix 6.6. INVENTORY AND INSPECTION |
§ 6.6.1. Right to Inspect |
§ 6.6.2. Compliance |
§ 6.6.3. System-Wide Inventory |
Appendix 6.7. LICENSE TERMINATION |
§ 6.7.1. Expiration for Inactivity |
§ 6.7.2. Termination |
Appendix 6.8. INSURANCE |
§ 6.8.1. Insurance Required |
§ 6.8.2. Minimum Coverages |
§ 6.8.3. AE as Additional Insured |
Appendix 6.9. WIRELINE ATTACHMENTS TO UTILITY POLES |
§ 6.9.1. Communication Space |
§ 6.9.2. Cable Position on the Pole |
§ 6.9.3. Clearance at the Pole |
§ 6.9.4. Non-Wooden Poles |
§ 6.9.5. Sag and Mid-Span Clearances |
§ 6.9.6. Anchors and Guying |
§ 6.9.7. Bonding and Grounding Requirements |
§ 6.9.8. Climbing Space |
§ 6.9.10. Service Drop Requirements |
§ 6.9.11. Communications Cable Riser Requirements |
Appendix 6.10. WIRELESS FACILITIES |
§ 6.10.1. Equipment Size and Dimensions |
§ 6.10.2. Signage |
§ 6.10.3. RF and EMF Compliance |
§ 6.10.4. Network Nodes on Distribution Poles |
§ 6.10.5. Network Nodes on Street Light Poles |